Self-assessment
interim evaluation notes for my personal views of my development
throughout the Design Production for Digital module so far- really a
reflection on just how much I have to do for the next two weeks before
the module hand in- recently having found it quite difficult in terms of
juggling my various Uni briefs, and not doing as much development as I
should through the OUGD202 brief.
By
the end of this week (inc. weekend) I am to have all of my storyboards
(both title sequence and 4 x idents) complete as well as having made all
my static images for my motion design outcomes- and then an intense
week and a half before hand in. A lot to do.
No comments:
Post a Comment